Mar 22, 2024
Topic: Board of Education
The Board of Education approved a bid at its October meeting for a contractor to replace the gym floor at Whitman over Winter Break.
The existing gym floor is original to the building when it was constructed in 1992. The current vinyl composite tile will be replaced with rubber athletic flooring, a surface that is used in a number of gyms in neighboring districts that have recently replaced their flooring.